This project was in support of a new welding shop for Siemens Industry Inc. in Sacramento, CA. The expansion included the design and construction of an 119,060 SF, pre-engineered structure for the Coaches Weld Shop and a 39,500 SF, pre-engineered warehouse structure. The weld shop included (2) 55,000 CFM air handler’s, with 2,500,000 BTU’s with 48” spiral duct and approximately 2000’ of air with 50 drops.
Image Source: Mark III Stock Image