Case Studies

As the innovation epicenter of Mark III Construction, our manufactured components team has developed a breakthrough method to plan, design, and build projects. By rethinking how we deliver complex projects, we are leading the evolution of construction. To learn more watch the informational videos and case studies on our past projects.

The Amazing Race: Volumetric Modular VS Kit-of-Parts

A confidential healthcare provider, Boulder Associates, The Boldt Company, and Mark III partnered to standardize and productize healthcare construction with the objective of increasing speed to market and quality.

Leveraging standardization and productization, the selected project team worked together to develop a method that will increase speed to market without sacrificing quality. To compare both delivery methods, volumetric modular and kit-of-parts, metrics were tracked and analyzed to determine the most effective process. This data can be used by decision-makers to determine the best course of action on future projects.

To learn more about the findings collected from the project, download our full case study.

READ MORE

Case Study: Standardize. Design. Manufacture.

In partnership with a forward-thinking major Northern California healthcare provider Mark III completed construction of a two-story medical office building (MOB) utilizing manufacturing, standardization, and componentized building. All interior wall panels, including in-wall MEP’s, were manufactured off-site and delivered for installation.

To learn more about the findings collected from the project, download our full case study.

READ MORE

PROJECT MOUNTAIN 2

Project Mountain 2 (PM2) is transforming the way medical organizations approach projects. We have discarded the outdated design and construction model. The PM2 system breaks innovative ground, leaning into virtual technology, standardization, and manufacturing.

To learn more about the findings collected from PM2, download our full case study.

LEARN MORE

PROJECT MOUNTAIN 1

Project Mountain 1 (PM1) delivered one of the most inefficient and complex systems to build, the hospital corridor, two ways – the old way, stick-build, and the new way, through standardized repeatable units. The first method, “stick-build,” utilized skilled craft labor to install each system individually. The second method, also known as “Project Mountain,” utilized preconstruction, fabrication, kitting, modeling, and detailing to install the kitted wall-system and multi-trade racking assembly.

Partner with Us

As the innovation epicenter of Mark III Construction, our Project Mountain series has developed a breakthrough method to plan, design, and build projects. By rethinking how we deliver complex projects, we are leading the evolution of construction. We are a team of dedicated disruptors. Exposing the world to a new, more efficient and effective way to build is our vision and our passion. We seek like-minded owners and general contractors to partner with us on our mission to lead the evolution of construction.

Contact Us

Contact Us

Corporate Office

5101 Florin Perkins Road
Sacramento, CA 95826
Phone: 916-381-8080 Fax: 916-386-0363

Fresno Office

5252 E. Home Avenue
Fresno, CA 93727
Phone: 559-353-2744 Fax: 559-840-1460