Torani Processing Facility

Location: San Leandro, CA

Contractor: Haskell

 

Trades: Plumbing, Process Piping

Value: $1.6 million


 

Mark III’s mechanical and plumbing scope of work for Torani’s processing facility included fixture installation, vent piping, and boilers with associated piping. Mark III saw cut and excavated on the new slab to install over (65) floor fixtures with associated underground piping. The stainless steel vent piping was prefabricated and installed utilizing Trimble technology for the layout. This project also included 4,000 feet of welded gas pipe and the installation of (2) owner-supplied Muira boilers.