Mark III delivered this project in support of the relocation/replacement of a CVFA boiler for SMUD in Elk Grove, CA. Our team was responsible for disconnecting all electrical and controls and providing new power and controls to a 750 kVA transformer at the new location. Additionally, our team provided medium voltage feeds and equipment, 208 V/480 V distribution, controls, switchgear, and UPS systems.
Image Source: Canva