Optical Lab
This project included the design-build of a state-of-the-art lens manufacturing facility in Folsom, CA. Mark III, in partnership with DesCor Builders, worked directly with VSP to manage the entire MEP scope of work. Our team designed, distributed, and installed the process piping, plumbing, and electrical systems including utility connections to over (200) pieces of equipment and fixtures.
Clean Room
Additionally, Mark III handled the design and construction of a Class 100,000 ISO 8 clean room for VSP. This included the installation of piping, water, air, sewer, power, and lighting distribution for the facility.