Vibra Healthcare Acute Rehabilitation

Location: Sacramento, CA

Contractor: M. J. Harris Construction

Trades: Electrical

Value: $5.3 million


 

Mark III’s electrical scope included the full installation of all electrical systems for this OSHPD 1 two-story rehabilitation hospital. The ground-up new build projects includes full primary and secondary utility infrastructure installation, site lighting package, emergency generator, power distribution systems, fire alarm system, interior lighting, power connections for mechanical, elevator, radiology, and kitchen equipment, and pathways for nurse call, communications, and A/V systems.

Fully BIM coordinated, Mark III’s virtual construction department created installation detail drawings for the full electrical scope using a 3D BIM model. This coordination was then used to prefabricate all in-wall assemblies and overhead racking. The remaining material was kitted based off the project drawings and BIM model.

Related Projects