Mark III performed electrical work on two (2) buildings at the UC Davis School of Veterinary Medicine. This project included the installation of a 750 kVA medium voltage transformer and a 2000 A service with 1200 A distribution. Additionally, this project included medium voltage tie-in to the campus power system, new lighting, and a new lighting control system with emergency inverters. Additionally, Mark III managed the subcontractor installation of complete telecom, security, and fire alarm systems.