El Dorado Community Health Center – Medical Office Building

Location: Placerville, CA

General Contractor: The Neenan Company

Trades: Mechanical, Electrical, Plumbing

Contract Value: $4.2  million


 

Mark III’s scope for this design-build medical office building includes plumbing, HVAC, and electrical.  The 30K SF building includes ~3,000 linear feet of light-gauge steel walls, all of which will be manufactured off site before being delivered for installation. The wall panels will include interior utilities and final connections will be performed by our onsite MEP team.

The HVAC scope of work includes the installation of all HVAC components, including rooftop heating and air conditioning units, filter curbs, filter banks, ductless split systems, louvers, supply and exhaust fans, intake hoods, all ductwork, all dampers, and building control systems. The plumbing scope includes all plumbing system components, including underground piping, domestic cold and hot water systems, sanitary sewer and drain systems, gas piping system, medical gas system at the dental area, plumbing fixtures and finish. The electrical scope includes generator, site lighting, main electrical power connection, lighting and light controls, nurse call, sound masking white noise, ECCRS and a 6-port EV charging station.

 

Related Projects