UC Davis Medical Center | Ped Pod Pressure Room

Location: Sacramento, CA

Customer: UC Davis Medical Center

Trades: Mechanical

Contract Value: $140k

Project Completion: August 2019


 

Mark III’s scope of work included redesigning and replacing three positive pressure rooms for UC Davis Medical Center. Additional work included modifying the existing HVAC and installation of (4) CAV’s for three other rooms. The duct was rerouted and installed per design.