UC Davis Med Center – DT7 Ped Pod Pressure Room

Location: Sacramento, CA

Contractor: Streamline Construction

Trades: Mechanical

Value: $140 K


 

Mark III’s scope of work included mechanical upgrades and modifications for three OSPHD-1 pressure rooms. The project included the redesign and changing of three existing rooms from negative to positive pressure, (4) new CAV’s, installation and re-routing of existing ducts, including the modification of the existing HVAC.